Private Organisation Water Treatment Plant WPT A Water Treatment Plant (WPT) is proposed by a private organization to be built under a concession of 18 years. The plant will be built in 2 phases as follows
Phase 1: 2 year construction period with a CAPEX of $12 million and an operation and maintenance period of 16 years at a cost of $300,000 per year. Revenue is expected to be
$1.3million per year on a contract led basis
Phase 2: 1 year construction period with a CAPEX of $4 million to begin in year 6 of the concession period. Operation and maintenance costs will be $200,000 per year and revenue is expected to be $600, 000 per year on a market-led basis
1) Develop a cumulative cash flow for the whole project and compute the internal rate of
Return (IRR), Net Present Value (NPV), Cash lock up (CLU) and Payback Period (PP)
Based on a Debt-Equity (d/E) choice of your own
2) Assess the optimistic and pessimistic cases by considering the risks in each phase and compute the irr’s and npv’s for each case
We can write this or a similar paper for you! Simply fill the order form!